AI PROJECT CLERK · FOR SMALL CONSTRUCTION COMPANIES
Your field crew keeps using the messaging app they already use — updates, photos, voice notes, English or Spanish. FieldThread files all of it into a structured project record the office can actually read.
WORKS WITH WHATSAPP TODAY · IMESSAGE AND TELEGRAM ON THE ROADMAP
IN PILOT WITH BAY AREA REMODELING AND RENOVATION CONTRACTORS.
DASHBOARD · TODAY · DEMO DATA
FIELDTHREAD / PROJECT RECORD
Oakview Kitchen Remodel
Client: R. Alvarado · AJ Home Remodeling
TUE 07·07
DELAYEDPOTENTIAL CHANGE ORDER · AWAITING 👍
Extra outlet run on the island
Luis: client asked for two more circuits. Approx. $1,840.
1
UNCONF >24H ›
1
CO FLAGS ›
0
STALE >3 DAYS ›
Today's log
3 ENTRIES · 2 MEDIA
7:12 AM — WORK · Marco (framing)
East wall framing closed up. Blocking in for the upper cabinets.
10:40 AM — DELIVERY · Rosa (tile)
Floor tile dropped, 14 boxes. Two boxes cracked, set aside.
1:05 PM — FLAG · Luis (electrical)
Voice note (ES): cliente pidió dos circuitos más en la isla.
4
OPEN ITEMS ›
ALL CATEGORIES
Tue 14
NEXT UP ›
ROUGH ELECTRICAL
2
MEDIA TODAY ›
PHOTOS + VIDEO
— WHY THIS EXISTS
There is no shortage of powerful construction platforms. Every one of them assumes somebody will do the data entry.
The daily log, the change order, the delivery, the photo — filed under the right job at the end of a long day. Crews don't. Not out of carelessness: it is one more app, one more login, one more thing standing between them and the work.
So the record never really gets built. The system of record turns out to be a fiction — reconstructed from scrollback and memory the week a dispute lands.
FieldThread does not try to win that fight. It removes it.
The record is not something people enter data into. It is assembled from the communication that is already happening — the same thread, the same photos, the same voice notes on the drive home.
The only thing that changes in the field is the number they text.
THE USUAL CHAIN
Two links have to hold every single day. Both are made of somebody's willpower at 6 p.m.
THE FIELDTHREAD CHAIN
One link, and it is the one thing on a jobsite that never stops happening on its own.
— AND THE AI PART
Every contractor is being told to figure out AI. With FieldThread you don't have to.
It is built in from day one, working behind the scenes, agnostic to how you run your jobs. No chatbot, no prompts, nothing new to learn. You get the result of the AI — a project record that keeps itself current — without anyone having to operate it.
— HOW IT WORKS
01
The crew texts the job thread
The messaging app your crew already uses, same group, same habits. “East wall is closed up.” A photo of the panel. A twenty-second voice note from the truck. Nobody logs into anything, and nobody gets trained.
02
The clerk files it
Every message gets read, translated where needed, and sorted: a daily log entry, an open item, a material need, a schedule date, or media. Voice notes are transcribed. Photos get a short id anyone can quote in a text.
03
The office reads the record
A live dashboard: what happened today, what is open, what is still waiting on a 👍, what is scheduled, what showed up. Read-only, on a link. There is nothing for the office to keep up to date.
— BILINGUAL BY DEFAULT
Crews text however they talk. Voice notes get transcribed, messages get translated, and the entry lands in the record in the language the office reads — with the original preserved underneath it.
AS SENT · 1:05 PM · LUIS (ELECTRICAL)
“Cliente pidió dos circuitos más en la isla, como $1,840.”
FILED AS · POTENTIAL CHANGE ORDER · AWAITING 👍
Client asked for two more circuits on the island. Approx. $1,840.
ORIGINAL SPANISH KEPT ON THE ENTRY
— THE ACTUAL PRODUCT
Five screens from a demo project. Not concept art — this is the shipped dashboard, drawn here with demo data from a fictional job.
FIELDTHREAD / PROJECT RECORD
Oakview Kitchen Remodel
Client: R. Alvarado
THU 07·09
DELAYEDNEEDS ATTENTION
Change order from Tuesday is still unconfirmed, and the tile shortage is now blocking Thursday.
1
UNCONF >24H ›
1
CO FLAGS ›
0
STALE >3 DAYS ›
Today's log
2 ENTRIES · 2 MEDIA
7:12 AM — WORK · Marco (framing)
East wall framing closed up. Blocking in for the upper cabinets.
10:40 AM — DELIVERY · Rosa (tile)
Floor tile dropped, 14 boxes. Two cracked, set aside.
4
OPEN ITEMS ›
Tue 14
NEXT UP ›
2
MEDIA TODAY ›
FIELDTHREAD / PROJECT RECORD
Oakview Kitchen Remodel
Client: R. Alvarado
THU 07·09
DELAYEDThu, Jul 9
2 ENTRIES · 2 MEDIA
7:12 AM — WORK · Marco (framing)
East wall framing closed up. Blocking in for the upper cabinets.
3:48 PM — MATERIAL · Rosa (tile)
Short two boxes of the 12×24. Need them before Thursday.
Wed, Jul 8
3 ENTRIES
Tue, Jul 7
5 ENTRIES · 3 MEDIA
Mon, Jul 6
2 ENTRIES
FIELDTHREAD / PROJECT RECORD
Oakview Kitchen Remodel
Client: R. Alvarado
THU 07·09
DELAYED— WHAT'S ON THE BOARD
— SCHEDULE
JULY 2026
FRI 10 · CABINET DELIVERY
TUE 14 · ROUGH ELECTRICAL INSPECTION
FIELDTHREAD / PROJECT RECORD
Oakview Kitchen Remodel
Client: R. Alvarado
THU 07·09
DELAYEDThu, Jul 9
3 MEDIA
#211 · 7:12 AM · Marco
#212 · 7:13 AM · Marco
#213 · 1:03 PM · Luis
Tue, Jul 7
3 MEDIA
#208 · 8:20 AM · Rosa
#209 · 11:02 AM · Rosa
#210 · 4:40 PM · Marco
FIELDTHREAD / ALL PROJECTS
AJ Home Remodeling
3 active jobs
THU 07·09
ATTN 1Oakview Kitchen Remodel
1420 Oakview Dr
2H AGO · 4 OPEN · 1 AWAITING 👍
Cedar Ct Bath
88 Cedar Ct
40M AGO · 1 OPEN · NOTHING WAITING
Larkspur ADU
7 Larkspur Way
6D AGO · QUIET SINCE PERMIT SUBMITTAL
SCROLL FOR ALL FIVE →
— WHAT THE RECORD HOLDS
SCREENS BELOW USE DEMO DATA FROM A FICTIONAL JOB.
Daily log
Every entry, time-stamped and attributed to the person who actually sent it.
7:12 AM — WORK · Marco (framing)
East wall framing closed up. Blocking in for the upper cabinets.
3:48 PM — MATERIAL · Rosa (tile)
Short two boxes of the 12×24. Need them before Thursday.
Open items
Change orders, questions and tasks — each carrying whether anyone has confirmed it.
Extra outlet run on the island
AWAITING 👍OPENED TUE JUL 7 · 1:05 PM · FROM LUIS (ELECTRICAL)
Confirm hood vent routing with client
CONFIRMEDOPENED MON JUL 6 · 9:20 AM · FROM DANA OFFICE
Schedule
Dates the crew mentioned in passing, put on a calendar instead of lost in a thread.
— SCHEDULE
JULY 2026
FRI 10 · CABINET DELIVERY
TUE 14 · ROUGH ELECTRICAL INSPECTION
Materials
What was asked for, what showed up, and what is short — with who said so.
Two boxes 12×24 floor tile short
OPENNeeded on site before Thursday tile start.
DUE THU JUL 9 · OPENED TUE JUL 7 · FROM ROSA (TILE)
Cabinet hardware — brushed nickel pulls
ON RECORDOPENED FRI JUL 3 · 8:05 AM · FROM DANA
Media
Photos and video, each with a handle the crew can quote back in a text: “redo #214.”
#211 · 7:12 AM · Marco
#213 · 1:03 PM · Luis
#214 · 3:48 PM · Rosa
Job context
Weather on the actual address, the client's number, and directions — one tap each, straight into your phone's own apps.
— 7-DAY FORECAST
WEDSUNNY76/547MPH
THUCLOUDY71/5316MPH
FRIRAIN64/5121MPH
WIND OVER 12MPH IS FLAGGED — IT DECIDES WHETHER ROOFING AND CRANE WORK HAPPEN.
Every job at a glance
Run three jobs or thirteen — each has its own record, and one screen shows which needs you. Health is derived from the record itself: what is open, what has gone unconfirmed too long, which job has gone quiet.
Oakview Kitchen Remodel
1420 Oakview Dr
2H AGO · 4 OPEN · 1 AWAITING 👍
Cedar Ct Bath
88 Cedar Ct
40M AGO · 1 OPEN · NOTHING WAITING
Larkspur ADU
7 Larkspur Way
6D AGO · QUIET SINCE PERMIT SUBMITTAL
— WHY YOU CAN TRUST IT
Append-only
Entries get added. Nothing already filed is silently rewritten later.
Corrections are preserved, not erased
“Actually it was 40 linear feet” is filed as a correction. The original stays readable underneath it, with both timestamps.
Every entry is attributed
Who sent it, from which number, at what time. No anonymous lines in the log.
The dashboard is read-only
There is no edit button in the office view. What the field said stays what the field said.
Your record is yours alone
Every company's projects live in their own private record — pilot to enterprise. Nothing is pooled across companies.
— ITEM HISTORY
Baseboard run — second floor hallway
TUE JUL 7 · 2:41 PM · CORRECTION · MARCO
“Actually it was 40 linear feet, not 24.”
TUE JUL 7 · 11:18 AM · ORIGINAL · MARCO
“Need about 24 linear feet of baseboard for the hallway.”
BOTH LINES STAY IN THE RECORD. THE CURRENT VALUE IS THE LATEST ONE.
— WHY WE'RE BUILDING THIS
Sky Link Solutions LLC
SYSTEMS AND AUTOMATION FOR SMALL BUSINESS
PLEASANTON, CALIFORNIA
FieldThread didn't start as a product idea. It started with contractors telling us — unprompted, in almost the same words — where their projects actually live: in a message thread, in voice notes, in photos buried in someone's camera roll. The history that decides disputes, change orders and payment was one lost phone away from gone.
We build systems for small businesses, and we had never seen a category fail its users so consistently: powerful platforms everywhere, and the people doing the work refusing all of them — because every one assumes the field will do data entry. We became convinced the record shouldn't be entered at all. It should be assembled from the communication already happening.
So we're building FieldThread alongside a small number of Bay Area remodeling and renovation contractors — on their real jobs, at their pace. If something in the record is wrong, we want to hear about it the same day.
— EARLY ACCESS
If you run a GC or sub shop of five to fifty people and your project history lives in a group thread nobody can search, write us about one job. No signup form, no demo funnel — an email, and a person answers it.
WORKS WITH WHATSAPP TODAY · IMESSAGE AND TELEGRAM ON THE ROADMAP